1. Identify the controlled reference
Record the drawing or model reference and its current revision. State which document governs if the model and drawing differ. Include any separate specification references and identify who can resolve conflicting requirements.
2. Separate specified details from open questions
List the material, finish, dimensions, tolerances and process requirements that are already specified. Mark unknowns clearly. Describe the function and the improvement you need without treating an early concept as a released production drawing.
3. Explain quantity and delivery needs
Distinguish sample pieces from a production batch and recurring demand. Include the delivery destination and requested date. Identify whether a quantity is an estimate or a committed requirement; pricing and delivery still require confirmation.
4. Describe acceptance before comparing quotes
Reference the inspection, documentation or sample-approval requirements that apply. Ask what is included in each proposal, how exceptions are identified and what information remains outstanding. A lower unit price alone does not establish that two proposals cover the same scope.
5. Agree on responsibilities and sharing
Clarify the design, sourcing, manufacturing and verification responsibilities for the project with DSC. For sensitive information, arrange the sharing process before sending drawings. Keep the original technical record with the responsible project team.
Prepare the next conversation
Use the RFQ builder to turn the available information into an editable text brief. It lists unanswered items separately and makes no engineering, price or delivery determination. Review the brief before sending it.
